Home Browse By Category Browse By Manufacturer View All Equipment Sell Your Equipment Wanteds View Auctions List Auction Manage Your Business Schedule A Demo Pricing News Register Login

Amada HA 250W 10" Fully automatic Horizontal bandsaw like Doall, 305A, Hyd-Mech H12, Marvel, Spartan PA 10

Brand
Category
Model
HA-250 W
Stock #
8212
Year
-250
Condition
Not specified
Location
Illinois

Overview

Category:
Saws
Manufacturer:
AMADA
Model:
HA-250 W
Condition:
Used - Rebuilt
Stock #:
8212
Status:
For Sale
Serial #:
25050013

Amada famous reliability, rebuilt to and beyond factory specs, 90 day warranty, Production horizontal bandsaw, heavy duty, rebuilt to Myers Technology's Proprietary 50+ point rebuilt process for years of trouble free operation, split vise.

Myers Technology Company Proprietary



50 Point Refurbishing and Repair Process



Myers Technology Company (MTC) carefully examines all major castings for cracks, wear, and weak point failure.

MTC tests all slide and pivot areas for proper alignment and functionality.

We start up and test run all equipment.

MTC ensures that all functions of both manual and autocycles work properly.

We take note of any missing or failing parts and place orders for replacement parts that meet or exceed OEM standards.

Once the machine passes inspection on steps 1-5, MTC begins disassembly.

All guards are removed and inspected for wear or cracks.

All way covers are removed and ways and covers inspected for wear or tear.

Machine oil is drained, cleaned and replaced with new oil to proper levels and condition.

All vices, chucks, and other mechanical control items are removed, cleaned and inspected.

The machine is thoroughly cleaned using steam, degreasers, and solvents.

The hydraulic system is tested for noise.

The hydraulic system pressure is tested for proper settings.

The hydraulic system couplings are examined and aligned as needed.

The hydraulic system hoses are inspected and replaced as needed.

The hydraulic system valves are inspected and tested for proper function.

Electrical system wires are cleaned and examined for damage or wear, replaced as needed.

Electrical system switches are cleaned and inspected for damage or wear, replaced as needed.

Electrical system controls are cleaned and inspected for damage or wear, replaced as needed.

The electrical system cabinet is examined and cleaned.

Worn and failing elements of the hydraulic and electrical systems are replaced as necessary.

Bearings are inspected for proper function and measured for play.

Bearings are replaced as necessary.

Motors are inspected and rebuilt or replaced as necessary.

Motor couplings are removed, cleaned, and examined for wear and failure, replaced as necessary.

Belts are inspected for wear, cracks, and fraying and replaced as necessary.

Belts are inspected for proper alignment.

Gearboxes are cleaned and inspected.

Oil is drained from gearbox.

Gearboxes are refilled with proper oil to correct levels.

Chip conveyors are cleaned and inspected for wear.

Coolant systems are cleaned and inspected.

Worn and failing elements of the gearbox, conveyor, and coolant systems are inspected and replaced as necessary.

Hydraulic fluid is drained and replaced to proper levels in hydraulic system.

All filters are removed and cleaned or replaced.

Sheet metal is cleaned and inspected for wear and failure.

Safety switches are cleaned and tested for proper function.

Safety switches are replaced as necessary.

Machine is inspected to ensure steps 1-38 have been properly completed.

Unit approved for painting.

All previously painted surfaces are prepped and primed.

All primed surfaces are given 2 coats of industrial grade paint.

All systems are reassembled to complete the machine.

All buttons and switches on control works are inspected for wear and functionality.

Machine functions are tested for performance.

Machine is operated in full automatic mode.

Test cuts are completed and examined for accuracy.

If unit passes tests in steps 44-47, machine is calibrated.

A video of the machine is recorded.

Machine is prepped for proper shipping, tied down, Wrapped, etc.

Machine is given a 6 month Warranty



There are many more items checked and repaired


Myers Technology Company Proprietary


50 Point Refurbishing and Repair Process



  1. Myers Technology Company (MTC) carefully examines all major castings for cracks, wear, and weak point failure.
  2. MTC tests all slide and pivot areas for proper alignment and functionality.
  3. We start up and test run all equipment.
  4. MTC ensures that all functions of both manual and autocycles work properly.
  5. We take note of any missing or failing parts and place orders for replacement parts that meet or exceed OEM standards.
  6. Once the machine passes inspection on steps 1-5, MTC begins disassembly.
  7. All guards are removed and inspected for wear or cracks.
  8. All way covers are removed and ways and covers inspected for wear or tear.
  9. Machine oil is drained, cleaned and replaced with new oil to proper levels and condition.
  10. All vices, chucks, and other mechanical control items are removed, cleaned and inspected.
  11. The machine is thoroughly cleaned using steam, degreasers, and solvents.
  12. The hydraulic system is tested for noise.
  13. The hydraulic system pressure is tested for proper settings.
  14. The hydraulic system couplings are examined and aligned as needed.
  15. The hydraulic system hoses are inspected and replaced as needed.
  16. The hydraulic system valves are inspected and tested for proper function.
  17. Electrical system wires are cleaned and examined for damage or wear, replaced as needed.
  18. Electrical system switches are cleaned and inspected for damage or wear, replaced as needed.
  19. Electrical system controls are cleaned and inspected for damage or wear, replaced as needed.
  20. The electrical system cabinet is examined and cleaned.
  21. Worn and failing elements of the hydraulic and electrical systems are replaced as necessary.
  22. Bearings are inspected for proper function and measured for play.
  23. Bearings are replaced as necessary.
  24. Motors are inspected and rebuilt or replaced as necessary.
  25. Motor couplings are removed, cleaned, and examined for wear and failure, replaced as necessary.
  26. Belts are inspected for wear, cracks, and fraying and replaced as necessary.
  27. Belts are inspected for proper alignment.
  28. Gearboxes are cleaned and inspected.
  29. Oil is drained from gearbox.
  30. Gearboxes are refilled with proper oil to correct levels.
  31. Chip conveyors are cleaned and inspected for wear.
  32. Coolant systems are cleaned and inspected.
  33. Worn and failing elements of the gearbox, conveyor, and coolant systems are inspected and replaced as necessary.
  34. Hydraulic fluid is drained and replaced to proper levels in hydraulic system.
  35. All filters are removed and cleaned or replaced.
  36. Sheet metal is cleaned and inspected for wear and failure.
  37. Safety switches are cleaned and tested for proper function.
  38. Safety switches are replaced as necessary.
  39. Machine is inspected to ensure steps 1-38 have been properly completed.
  40. Unit approved for painting.
  41. All previously painted surfaces are prepped and primed.
  42. All primed surfaces are given 2 coats of industrial grade paint.
  43. All systems are reassembled to complete the machine.
  44. All buttons and switches on control works are inspected for wear and functionality.
  45. Machine functions are tested for performance.
  46. Machine is operated in full automatic mode.
  47. Test cuts are completed and examined for accuracy.
  48. If unit passes tests in steps 44-47, machine is calibrated.
  49. A video of the machine is recorded.
  50. Machine is prepped for proper shipping, tied down, Wrapped, etc.
  51. Machine is given a 30-, 60- or 90-day Warranty on a case-by-case basis.


There are many more items checked and repaired


This is a general description of Myers Co. process. MTC works on many different types of machines. This marketing document in no way constitutes a contract, written or implied.



Rapid head advance, Piece counter, Multiple feed stroke control, Carbide faced blade guides, Variable speed drive, Coolanr system with Wash down hose

Rect-Cap (H)10"
Rect-Cap (W)12"
Rounds-Cap10"
Power5 hp
Type (Auto, Manual, Semi)Auto
Blade Width1.25"
Blade Thickness0.042"
Blade Length138"
Dimensions7, x 7, x 5' 6"
Weight2600 Lbs.
No files or videos to display

Want to request a quote from the owner of this listing?

Similar Listings to - Amada HA 250W 10" Fully automatic Horizontal bandsaw like Doall, 305A, Hyd-Mech H12, Marvel, Spartan PA 10

Amada HFA 400W Automatic Horizontal , Programmable bandsaw, NC control, 16" Capacity, like Marvel, Spartan, Hyd-mech, HEM, Kasto, Behringer
AMADA

Saws, Band, Horizontal

10'' X 12'' AMADA MODEL H-250SA II HORIZONTAL BANDSAW: STOCK #77308
AMADA

Saws, Band, Horizontal

36" X 24'' AMADA H-900 HD HORIZONTAL BAND SAW. STOCK # 1061723.
AMADA

Saws, Band, Horizontal

Customize Settings

Your Privacy Is Important To Us

Cookies are very small text files that are stored on your computer when you visit a website. We use cookies for a variety of purposes and to enhance your online experience on our website (for example, to remember your account login details).

You can change your preferences and decline certain types of cookies to be stored on your computer while browsing our website. You can also remove any cookies already stored on your computer, but keep in mind that deleting cookies may prevent you from using parts of our website.

Choose which cookies you want to enable or disable: